VDOT News - Bristol

RELEASE:

CONTACT:
IMMEDIATE

Michelle Earl 276-696-3283
[email protected]

BR-21045

July 9, 2021



July 12 - 18, 2021: Bristol's Weekly Traffic Alert

BRISTOL – In an effort to keep motorists informed, the Virginia Department of Transportation (VDOT) provides weekly information about highway construction and maintenance projects in southwestern Virginia. When traveling through highway work zones, use caution and be alert to changes in traffic patterns and slow-moving or stopped traffic.

To help motorists take the guesswork out of travel plans, call VDOT’s 511 or visit http://www.511virginia.org for real-time traffic information.

Entries with asterisks (***) indicate the listing is new or the status of the project has changed since last week’s traffic alert.

INTERSTATE PROJECTS
Interstate 81 – Exit 17: Motorists should be alert to work underway to improve Interstate 81 exit 17. The project includes improvements to the exit 17 northbound on and off ramps, improvements to a segment of Route 75, reconstruction and relocation of Gravel Lake Road, lengthening the I-81 southbound on ramp, and relocation of the frontage road located adjacent to the northbound exit 17 off ramp. (Completion: Fall 2022)

Interstate 81 – Exit 19: Be alert to the new traffic patter along Empire Drive within the I-81 exit 19 work zone. A temporary stop sign will be in place until the new signals are operational. The project includes realigning a portion of Empire Drive, widening a curve along the southbound off ramp, and adding traffic signals at the intersection of newly aligned Empire Drive and Route 11 and where Route 11 intersects with the end of the exit 19 southbound ramps. (Completion: Summer 2022)

I-77 bridges over Cove Creek: Be alert to a project to replace the Interstate 77 bridges over Cove Creek in Wythe County, located about two miles north of Interstate 81 between mile markers 44 and 42. Motorists can expect an altered traffic pattern on southbound I-77 and periodic nighttime lane closures while work is underway. (Completion: early 2023)

Interstate 81 bridges at Atkins: A project to replace the Interstate 81 bridges near mile marker 52 in the Atkins area of Smyth County is underway. Be alert to traffic shifts through the work zone. The speed limit in the work zone is 60 mph. (Completion: Fall 2022)

Interstate 81 bridges over Reed Creek: Due to replacement of the Interstate 81 bridges over Reed Creek in Wythe County, be alert to altered traffic patterns, narrowed lanes (11-feet-wide northbound), and nighttime lane closures in the work zone. The bridges are located about one-mile north of the I-77 split at I-81 exit 81. The speed limit through the work zone is 60 mph. Allow extra travel time and watch out for workers. (Completion: Fall 2021)

***Interstates 81 and 77 maintenance activities: This week, be alert to the following lane closures due to maintenance activities:
Interstate 81
- 24-hour lane closure Monday through Friday due to bridge deck repairs southbound near exit 35 in Smyth County.
Interstate 77
- Nighttime lane closures northbound at East River Mountain Tunnel due to tunnel maintenance. Wide loads over 12-feet must stop before entering the tunnel during nighttime lane closures.


PRIMARY HIGHWAYS AND HIGH TRAFFIC SECONDARY ROADS:

Bland County
Route 602 (Spur Branch Road): Due to repairs to the Route 602 (Spur Branch Road) bridge in Bland County, located near the intersection of Route 601 (Little Creek Highway), be alert to the possibility of periodic lane closures weekdays.


Buchanan County
Route 460/121 Poplar Creek Phase A: Construction of Route 460/121 Poplar Creek Phase A is underway in Buchanan County. Impacts on motorists are minimal because the majority of the work is on a new location; however, the project has created a permanent change for Route 614 (Woods Fork). Poplar Creek Phase A will split a portion of Route 614 and cul-de-sacs will be added on either end of Route 614 where it ends at the new highway, approximately 2.75 miles from Route 609 at Bull Creek and 1.25 miles from Route 604 at Poplar Creek. Access to the north and south ends of Route 614 will be via Routes 609 (Bull Creek Road) and 604 (Poplar Creek Road), respectively, which connect to Route 460 west of Grundy.

Dickenson County
Route 83: Be alert to the possibility of delays along Route 83 in Wise and Dickenson counties from the intersection of Route 631 (Mill Creek) near Pound to the Buchanan County line due to a project to add paved shoulders with rumble strips and improve guardrail along Route 83. Be alert to flaggers and pilot vehicles leading motorists through the work zone. (Completion: early December 2021)


Lee County
Route 58 truck climbing lane at Powell Mountain: A project to add a truck climbing lane to Route 58 at Powell Mountain in Lee County is underway. The project will add a 1,000-foot truck climbing lane to the west side of Powell Mountain, improving safety by providing motorists a safer way to pass trucks along the steep grade. Be alert to periodic delays and watch for workers. (Completion: September 2021)

Route 58 bridge over the Powell River: A new traffic pattern is in place across the Route 58 bridge over the Powell River near Jonesville in Lee County, with traffic now traveling on the newly constructed side of the bridge. Signals are controlling one-way traffic across the bridge. Use caution in this area and allow for slight travel delays. (Completion: fall 2021)


Scott County
Route 23 access improvements/Park and Ride: North and southbound traffic through the Route 23 work zone in the Gate City/Moccasin Gap area of Scott County is restricted to one lane in each direction. The closure allows crews to remove the current median and construct a new one. Allow extra travel time, especially during morning and afternoon hours when commuter traffic volumes are high. The project will improve access, as well as add a Park and Ride lot near the intersection of Route 23 and Route 619 (Filter Plant Road). Pay close attention to work zone signs and watch for workers. (Completion: Fall 2021)


Tazewell County
Tazewell Avenue Bridge Repairs (Bluefield): The Tazewell Avenue bridge in Bluefield closed to traffic in late April and will remain closed approximately 6 months due to repairs. The bridge is located over Beaver Pond Creek between Walnut Street and S. College Avenue (Route 102). During repairs, motorists will use Walnut Street, Virginia Avenue, and S. College Avenue to detour (distance: .2-mile). (Completion: fall 2021)

Route 19 (Virginia Avenue) bridge over Wrights Valley Creek (Bluefield): Be alert to an altered traffic pattern on Route 19 at the bridge over Wrights Valley Creek near Bluefield due to reconstruction of the bridge. Use caution in the area and pay close attention to work zone signs. (Completion: July 2021)


Wise County
Route 83: Be alert to the possibility of delays along Route 83 in Wise and Dickenson counties from the intersection of Route 631 (Mill Creek) near Pound to the Buchanan County line due to a project to add paved shoulders with rumble strips and improve guardrail along Route 83. Be alert to flaggers and pilot vehicles leading motorists through the work zone. (Completion: early December 2021)


Wythe County
***Route 619 (Gleaves Road): The Route 619 (Gleaves Road) bridge over Cripple Creek in Wythe County will be closed to through traffic from 9 a.m. – 3 p.m. Thursday (July 15) due to a bridge inspection. The bridge is located 0.60-mile from Route 646 and from Route 602.

Route 664 (Glade Road) bridge: Due to replacement of the Route 664 (Glade Road) bridge over Reed Creek in Wythe County, the bridge is closed to traffic and will remain closed through spring 2022. Route 664 will be closed from .99-mile east of Route 711 to 1.06-mile east of Route 711. Be alert to detour signs that will be in place before the project begins. (Completion: Spring 2022)


Completed
Allegheny Street bridge improvements in Richlands: A project to repair and replace the Allegheny Street bridge over Big Creek in Richlands is complete.



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Aug. 28, 2023